Question: PERT requires

Options

A : single time estimate

B : double time estimate

C : triple time estimate

D : none of these

Click to view Correct Answer

Previous || Next

Industrial Engineering and Production Management - Part 1 more questions

Direct expenses include

String diagram is used

Which of the following type of layout is suitable for....

Representative time is the average of times recorded by work....

Queuing theory is associated with

Which of the following statement is correct?

The product layout is more amenable to automation than process....

In break even analysis, total cost consists of

The sleeve or muff coupling is designed as a

A sliding bearing in which the working surfaces are completely....

Automobile Engineering - Part 1 more Online Exam Quiz

Engineering Mechanics - Part 1

Heat Transfer, Refrigeration and Air Conditioning - Part 1

Hydraulic Machines - Part 1

Hydraulics and Fluid Mechanics - Part 1

IC Engines and Nuclear Power Plants - Part 1

Machine Design - Part 1

Production Engineering - Part 1

Steam Boilers and Engines - Part 1

Steam Nozzles and Turbines - Part 1

Theory of machines - Part 1