Question: In value engineering, the term value refers to

Options

A : manufacturing cost of the product

B : selling price of the product

C : total cost of the product

D : utility of the product

Click to view Correct Answer

Previous || Next

Industrial Engineering and Production Management - Part 1 more questions

The secondary fuel used in nuclear power plants is

The aim of value engineering is to

In time study, the rating factor is applied to determine

Gantt chart is used for

The main object of scientific layout is

In inventory control theory, the economic order quantity is

Production cost refers to prime cost plus

A systematic job improvement sequence will consist of

Work sampling is applied for

Military type of organisation is known as

Automobile Engineering - Part 1 more Online Exam Quiz

Engineering Mechanics - Part 1

Heat Transfer, Refrigeration and Air Conditioning - Part 1

Hydraulic Machines - Part 1

Hydraulics and Fluid Mechanics - Part 1

IC Engines and Nuclear Power Plants - Part 1

Machine Design - Part 1

Production Engineering - Part 1

Steam Boilers and Engines - Part 1

Steam Nozzles and Turbines - Part 1

Theory of machines - Part 1