Question: Pick up the correct statement from the following :

Options

A : Detention period for plain sedimentation tanks ranges between 4 to 8 hours

B : Detention period for sedimentation tanks, using coagulants usually ranges between 2 to 4 hours

C : The horizontally flow velocity in sedimentation tanks, is generally limited to 0.3 m/minute

D : All the above.

Click to view Correct Answer

Previous || Next

Water Supply Engineering - Part 1 more questions

Economic height of a dam is the height corresponding to....

Distribution mains of any water supply, is normally designed for....

If pH value of water is

In pressure supply mains, water hammer pressure is reduced by....

Water supply system includes

The maximum permissible nitrites in public water supplies, is

A high velocity of wash water is required for

In distribution pipes, drain valves are provided at

Corrosion of well pipes may not be reduced by

Manholes along the mains from the source to a city....

Advanced Surveying - Part 1 more Online Exam Quiz

Theory of Structures - Part 1

Tunnelling - Part 1

UPSC Civil Service Exam Questions - Part 1

Waste Water Engineering - Part 1

Water Resources Engineering - Part 1

Artificial Intelligence - Part 1

Automation System - Part 1

Computer Fundamentals - Part 1

Computer Hardware - Part 1

Database Systems - Part 1