Question: To attain the required shape of the tunnel section, we use :
Options
A : easers
B : trimmers
C : cut holes
D : chisels.
Tunnelling - Part 1 more questions
The difference of heights of the tunnels above rail tops....
For B.G. single track railway, the height of the tunnel....
Pick up the correct statement regarding drilling a tunnel from....
For tunnels exceeding 300 m in length, the grade should....
The method of draining in the tunnels, is generally known....
Which one of the following linings is suitable for shield....
The following tunnels were constructed in different countries for different....
The following operations are generally employed for tunnelling in hard....
Pick up the mechanical ventilation method used for tunnels from....
Advanced Surveying - Part 1 more Online Exam Quiz
Steel Structure Design - Part 1
Strength of Materials - Part 1
Structural Design Specifications - Part 1
UPSC Civil Service Exam Questions - Part 1
Waste Water Engineering - Part 1
Water Resources Engineering - Part 1