Question: Pick up the correct statement from the following :

Options

A : inclined borings are made for taking samples under existing structures

B : inclined borings are occasionally used instead of vertical holes.

C : the spacing of inclined borings is kept such that one bore hole is vertically above the bottom of an adjacent bore hole.

D : all the above.

Click to view Correct Answer

Previous || Next

Building Construction - Part 1 more questions

Queen closer may be placed

Dado is usually provided in

The foundation in which a cantilever beam is provided to....

The foundations are placed below ground level, to increase

Stud(s) of a common wooden partition

To ensure that supporting area of an offset footing of....

The 9 cm x 9 cm side of a brick....

The taper of precast concrete pile should not be more....

The under surface of an arch, is called

The raft slab is projected beyond the outer walls of....

Advanced Surveying - Part 1 more Online Exam Quiz

Refractory Technology - Part 1

Stoichiometry - Part 1

Advanced Surveying - Part 1

Airport Engineering - Part 1

Applied Mechanics - Part 1

Building Materials - Part 1

Concrete Technology - Part 1

Construction Management - Part 1

Docks and Harbours - Part 1

Elements of Remote Sensing - Part 1